DESKTOP
1440 <
991 >
767 >
478 <
Play Reel

.home: the new standard for stacked timber construction.

.home is a modular timber building system based on high-quality, robotically milled timber elements. Ten years of R&D, data and engineering come together in a building system that pushes the boundaries of stacked timber construction in three crucial areas:

  • 1. Maximum Design Freedom

    Our system standardises the smart connections, not the modules themselves. The modules are fully parametric, but the real freedom lies in the flexible stacking. Because columns don't have to sit directly above one another, architecturally ambitious and complex buildings are possible without sacrificing efficiency.

  • 2. Radically Efficient Nodes

    At the heart of .home are the ‘nodes’. These connections are the result of years of research with the best labs in the Netherlands. Our in-house, AI-driven software engineers these nodes so efficiently that we achieve top performance in fire safety and sound insulation with 30 to 50% less material than comparable timber building systems.

  • 3. Less Impact, More Value

    Less material directly means lower costs for procurement and transport, and a lighter foundation. The slim walls and floors also add more net sellable floor area. The result: a better return for the developer and a significantly lower environmental impact for the planet.

500

homes delivered

50

municipalities

projects delivered

>25

partners

in 5 countries

Get started in 5 steps

From tender to final design: Sustainer can join at any project stage.

1: Free quickscan

Based on your floor plans, we assess feasibility and give a first cost estimate for the building kit, assembly and finishing. So you know straight away where you stand.

2: Tender/design phase

For your tender, we supply standard documentation or join your design team. Together we make smart choices with immediate insight into the impact on cost, time and quality.

3: Permit phase

Our proven standards make it possible to take firm design decisions early in the process. We aim for SO=UO (sketch design equals final design): ideally, the tender design is ready for a permit straight away.

4: Choosing construction partners

Early in the design process, request an accurate construction cost estimate from one of our construction partners. Every decision is then tested against practice straight away, and you work with the right numbers from the start.

5: Production model

After the permit, we deliver the production-ready BIM model in about 2 months. This starts the production chain: from delivery of the building kit to the lightning-fast assembly of the modules on your site.

Latest Projects

.30-.50

MPG

Depending on design

50

metres

Max building height

300

m²/day

Placement on site